Verfahren und Vorrichtung zur Steuerung von mit einem Stromnetz verbundenen Lasten
Anmelder: General Electric Company 🇺🇸
Details
- Veröffentlichungs-Nr.
- EP2474814
- Aktenzeichen
- EP12150738
- Anmeldetag
- 11. Januar 2012
- Veröffentlichung
- 11. Juli 2012
- Rechtsraum
- EP
- IPC
- G01D4/00H02J3/14H02J13/00
Abstract
An energy meter (46) configured to couple to an electrical grid (14) for monitoring energy consumption of an electrical load (40) connected to the energy meter is described. The energy meter includes a processor (60) and at least one input device (62, 64) coupled to the processor. The at least one input device is configured to receive energy usage data from the electrical load (40) and pricing data from a utility company (12). The energy meter also includes a communication device (66) coupled to the processor and configured to wirelessly communicate with a portable electronic device (70) associated with a customer of the utility company.
Anmelder
- Firma
- General Electric Company
- Land
- 🇺🇸 USA
US-amerikanischer Technologiekonzern mit Sitz in Massachusetts. Historisch aktiv in Energieerzeugung, Luftfahrttriebwerken, Medizintechnik und Industrietechnik über verschiedene Geschäftsbereiche.
19.755 Patente in unserer Datenbank