System und Verfahren zur Bestimmung der potenziellen Leistung eines Umrichters im Beschränkungsmodus

EP2595267 Art B1 14. November 2018

Anmelder: General Electric Company 🇺🇸

Details

Veröffentlichungs-Nr.
EP2595267
Aktenzeichen
EP12193462
Anmeldetag
20. November 2012
Veröffentlichung
14. November 2018
Erteilung
14. November 2018
Rechtsraum
EP
IPC
H02J3/38H02J3/50
Offizieller Volltext

Abstract

A power inverter system (100) includes a plurality of power inverters such as solar inverters (108), (110), (112), (114) receiving power from at least one energy source (104), (106). Each power inverter includes algorithmic maximum peak power tracking (MPPT) software or integrated MPPT firmware to calculate its own potential real power. A controller (130) is in electrical communication with selected power inverters that are operating in curtailed modes of operation and commands each selected power inverter to shift its power production duties and to perform MPPT sweeps. Each selected power inverter then calculates its own potential real power capability in response to corresponding MPPT sweep data. The potential real power capability information is received by the controller (130) that transmits the information to a power utility (120) allowing the power utility (120) to more efficiently utilize real and reactive power available by the plurality of power inverters (108), (110), (112), (114).

Anmelder

Firma
General Electric Company
Land
🇺🇸 USA
🇺🇸 General Electric

US-amerikanischer Technologiekonzern mit Sitz in Massachusetts. Historisch aktiv in Energieerzeugung, Luftfahrttriebwerken, Medizintechnik und Industrietechnik über verschiedene Geschäftsbereiche.

19.762 Patente in unserer Datenbank

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen