Überwachung des Tunnelprofils Während der Vortriebsarbeiten

EP3385500 Art B1 17. August 2022

Anmelder: Sandvik Mining and Construction Oy 🇫🇮

Details

Veröffentlichungs-Nr.
EP3385500
Aktenzeichen
EP17164998
Anmeldetag
5. April 2017
Veröffentlichung
17. August 2022
Erteilung
17. August 2022
Rechtsraum
EP
IPC
E21D9/00
Offizieller Volltext

Abstract

Provided is a method for rock processing monitoring, comprising: storing tunnel model data defining target tunnel profile (62) for a mobile rock processing machine, receiving operational tunnel profile data generated on the basis of scanning of surroundings of the rock processing machine and defining a realized tunnel profile (63), detecting current position (64) of a tool of the rock processing machine, defining the difference (67) between the target tunnel profile and the realized tunnel profile on the basis of the position of the tool and on the basis of the tunnel model data and the realized tunnel profile data, and indicating the difference between the target tunnel profile and the realized tunnel profile on the basis of the position of the tool.

Anmelder

Firma
Sandvik Mining and Construction Oy
Land
🇫🇮 Finnland
🇫🇮 Sandvik Mining and Construction

Finnische Gesellschaft des Sandvik-Konzerns, die Maschinen und Ausrüstung für Bergbau und Bauwesen entwickelt und herstellt.

498 Patente in unserer Datenbank

Fachgebiete

Vertreten von

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen