Fundamentbausystem für eine Offshore-Windenergieanlage und Verfahren zur Installation einer Offshore-Windturbine

EP3502353 Art B1 21. April 2021

Anmelder: Siemens Gamesa Renewable Energy A/S 🇩🇰

Details

Veröffentlichungs-Nr.
EP3502353
Aktenzeichen
EP17209983
Anmeldetag
22. Dezember 2017
Veröffentlichung
21. April 2021
Erteilung
21. April 2021
Rechtsraum
EP
IPC
E02D27/52F03D13/20
Offizieller Volltext

Abstract

Foundation building system for an offshore wind turbine, whereby a monopile (1) to be placed on the seabed (2), having an upper portion (3) with a first attachment interface (8) for attaching a foundation platform unit (11), at least one internal, second attachment interface (9) in an interior cavity (7) of the monopile (1) for attaching at least one electrical platform unit (21), and a third attachment interface (10) for attaching a tower (39) of the offshore wind turbine atop the at least one electrical platform unit (21), wherein the upper portion (3) is to be placed at least partly above sea level (4),the foundation platform unit (11) providing at least one foundation platform (13) extending around the tower (39) when installed, and the at least one electrical platform unit (21) comprising at least one platform (27, 28, 29) for electrical equipment for guiding and/or connecting of an connection cable (38) for connecting the offshore wind turbine.

Anmelder

Firma
Siemens Gamesa Renewable Energy A/S
Land
🇩🇰 Dänemark
🇪🇸 Siemens Gamesa Renewable Energy

Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.

2.713 Patente in unserer Datenbank

Vertreten von
Aspacher, Karl-Georg Siemens Gamesa Renewable Energy GmbH & Co. KG · Inhouse München, Deutschland
1.366
Patente gesamt
24
Fachgebiete
6
Anmelder-Länder
Zum Anwaltsprofil
Weitere Vertreter

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen