Stromkabelinstallation in einem Windturbinenturm

EP3702616 Art B1 24. August 2022

Anmelder: Siemens Gamesa Renewable Energy A/S 🇩🇰

Details

Veröffentlichungs-Nr.
EP3702616
Aktenzeichen
EP19159335
Anmeldetag
26. Februar 2019
Veröffentlichung
24. August 2022
Erteilung
24. August 2022
Rechtsraum
EP
IPC
F03D80/80
Offizieller Volltext

Abstract

It is described a method of installing a power cable (5) in a wind turbine tower (1), in particular for transportation, the method comprising: arranging a section (5) of the cable within the tower, the section having a length, in particular by at least an upper excess cable portion, greater than the tower height (h), by forming a cable loop (27, 33) within the tower (1), wherein an angle enclosed between a normal (34) of a cable loop plane and the longitudinal direction (4) of the tower (1) is between 70° and 110°.

Anmelder

Firma
Siemens Gamesa Renewable Energy A/S
Land
🇩🇰 Dänemark
🇪🇸 Siemens Gamesa Renewable Energy

Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.

2.713 Patente in unserer Datenbank

Vertreten von
Aspacher, Karl-Georg Siemens Gamesa Renewable Energy GmbH & Co. KG · Inhouse München, Deutschland
1.366
Patente gesamt
24
Fachgebiete
6
Anmelder-Länder
Zum Anwaltsprofil
Weitere Vertreter

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen