Abstract
It is described a method of installing a power cable (5) in a wind turbine tower (1), in particular for transportation, the method comprising: arranging a section (5) of the cable within the tower, the section having a length, in particular by at least an upper excess cable portion, greater than the tower height (h), by forming a cable loop (27, 33) within the tower (1), wherein an angle enclosed between a normal (34) of a cable loop plane and the longitudinal direction (4) of the tower (1) is between 70° and 110°.
Anmelder
- Firma
- Siemens Gamesa Renewable Energy A/S
- Land
- 🇩🇰 Dänemark
Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.
2.713 Patente in unserer Datenbank
Fachgebiete
-
SGRE-Association
SGRE-Association · Erlangen