Verfahren zur Offshore-Montage einer Windturbine
Anmelder: Siemens Gamesa Renewable Energy A/S 🇩🇰
Details
- Veröffentlichungs-Nr.
- EP3792486
- Aktenzeichen
- EP19197475
- Anmeldetag
- 16. September 2019
- Veröffentlichung
- 18. Februar 2026
- Erteilung
- 18. Februar 2026
- Rechtsraum
- EP
- IPC
- F03D13/10B66C23/52
Abstract
It is described a method of offshore mounting a wind turbine (1), the wind turbine (1) comprising a foundation (2), a tower (3), a nacelle (4) and a plurality of blades (5). The method comprising steps of: a) mounting the foundation (2) on a sea ground (S); b) mounting the tower (3) to the foundation (2); c) mounting the nacelle (4) to the tower (3); and d) mounting the plurality of blades (5) to the nacelle (4). At least one of the steps a) through c) is performed by use of at least one floating vessel (6) which is exclusively supported by buoyancy when performing the at least one of the steps a) through c).
Anmelder
- Firma
- Siemens Gamesa Renewable Energy A/S
- Land
- 🇩🇰 Dänemark
Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.
2.707 Patente in unserer Datenbank
-
SGRE-Association
SGRE-Association · Erlangen