Gemeinsame Lastnutzung über Mehrere Stromversorgungen

EP4148934 Art A3 29. März 2023

Anmelder: General Electric Company 🇺🇸

Details

Veröffentlichungs-Nr.
EP4148934
Aktenzeichen
EP22195100
Anmeldetag
12. September 2022
Veröffentlichung
29. März 2023
Rechtsraum
EP
IPC
H02J1/10H02J1/14H02J7/34H02J7/00
Offizieller Volltext

Abstract

A power system (150) operable to implement a power balancing control scheme is provided. In one aspect, a power system (150) includes multiple independent power supplies (182A, 182B) with independent batteries (172A, 172B) feeding onto a common power bus (180). The power supplies (182A, 182B) regulate the voltage on the common power bus (180) at the same time. The power balancing control scheme, when implemented, causes the load on the common power bus (180) to be shared among the individual power supplies (182A, 182B) with a specified load distribution. The specified load distribution can be set or determined to balance the State of Charge (SoC) of the batteries (172A, 172B) over time whilst taking into account the constraints or limits of the elements (172A, 172B, 182A, 182B) of the power system (150).

Anmelder

Firma
General Electric Company
Land
🇺🇸 USA
🇺🇸 General Electric

US-amerikanischer Technologiekonzern mit Sitz in Massachusetts. Historisch aktiv in Energieerzeugung, Luftfahrttriebwerken, Medizintechnik und Industrietechnik über verschiedene Geschäftsbereiche.

19.755 Patente in unserer Datenbank

Vertreten von

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen