Verfahren und Vorrichtung zur Computerimplementierten Überwachung einer Windturbine

EP4390120 Art A1 26. Juni 2024

Anmelder: Siemens Gamesa Renewable Energy A/S 🇩🇰

Details

Veröffentlichungs-Nr.
EP4390120
Aktenzeichen
EP22215852
Anmeldetag
22. Dezember 2022
Veröffentlichung
26. Juni 2024
Rechtsraum
EP
IPC
F03D17/00F03D7/02// F03D7/04
Offizieller Volltext

Abstract

The invention relates to a method for computer-implemented monitoring of a wind turbine having a rotor with rotor blades (10). The rotor blades (10) are provided with an active flow control device (11D, 12D, 14D). During the operation of the wind turbine the following steps are performed: i) obtaining digital operation data (OD) of the wind turbine, the operation data (OD) being current sensor data (WTSD) taken by a plurality of sensors installed on the wind turbine and a control signal (AFCD CS) for controlling the active flow control device (11D, 12D, 14D) to adopt a specific state; ii) determining an estimate (ECLI) of the state and/or performance degradation of the active flow control device (11D, 12D, 14D) by processing the operation data (OD) by a trained data driven model (DDM), where the operation data (OD) are fed as a digital input to the trained data driven model (DDM) and the trained data driven model (DDM) provides the estimate (ECLI) of the state and/or performance degradation of the active flow control device (11D, 12D, 14D) as a digital output.

Anmelder

Firma
Siemens Gamesa Renewable Energy A/S
Land
🇩🇰 Dänemark
🇪🇸 Siemens Gamesa Renewable Energy

Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.

2.713 Patente in unserer Datenbank

Vertreten von

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen