An assembly stand (1) and associated method for assembling a concrete ring (11) from a plurality of concrete segments (10), the assembly stand (1) comprising a plurality of beams (2) configured to support the concrete segments during their assembly into the concrete ring, in particular the beams mounted with a star configuration from the central axis, a movement mechanism (3) mounted on one or of more of the plurality of beams (2), in particular mounted on all beams (2), wherein each movement mechanism (3) is configured to contact or engage with an underside of the concrete segments (10) and to allow a controlled movement of the concrete segments (10) relative to the beam (2) when an assembly force (F) is applied.
Anmelder
- Firma
- Siemens Gamesa Renewable Energy Innovation & Technology S.L.
- Land
- 🇪🇸 Spanien
Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.
243 Patente in unserer Datenbank
Vertreten von
-
SGRE-Association
SGRE-Association · Erlangen