Verfahren und System zur Optimierung des Brennstoffverbrauchs in einem Zementherstellungsofen
Anmelder: Innomotics GmbH 🇩🇪
Details
- Veröffentlichungs-Nr.
- EP4715307
- Anmeldetag
- 19. September 2024
- Veröffentlichung
- 25. März 2026
- Rechtsraum
- EP
- IPC
- F27D19/00, F27D21/00
Abstract
The present disclosure teaches a method and system of optimizing fuel consumption in a cement manufacturing kiln. The method comprises determining one or more boundary ranges for one or more operational parameters of a plurality of operational parameters. Further, the method comprises determining that the one or more operational parameters, is outside of the one or more boundary ranges determined for the one or more operational parameters. The method further comprises predicting a fuel consumption of the cement manufacturing kiln during a time period during which the one or more operational parameters is outside of the one or more boundary ranges. The method further comprises generating a control signal based on the determination that the one or more operational parameters, is outside of the one or more boundary ranges, wherein the control signal is configured to optimize the fuel consumption of the cement manufacturing kiln.
Anmelder
- Firma
- Innomotics GmbH
- Land
- 🇩🇪 Deutschland
Deutsches Unternehmen mit Sitz in Nürnberg, hervorgegangen aus dem Siemens-Motorengeschäft. Innomotics entwickelt Elektromotoren, Großantriebe und Antriebssysteme für die Industrie.
196 Patente in unserer Datenbank