Abstract

The invention describes an installation assembly (1) for use in installing a secondary nacelle structure (20S) underneath a wind turbine nacelle (20), which installation assembly (1) comprises a winch assembly comprising at least a winch cable (16) and a winch (18); a means (10, 11) of connecting the winch cable (16) to the secondary nacelle structure (20S); a bracket (12) adapted for installation at the mounting height of the secondary nacelle structure (20S); and a means (10, 102, 122, 14) of connecting the bracket (12) to the secondary nacelle structure (20S) after raising the secondary nacelle structure (20S) to its mounting height using the winch assembly (16, 18). The invention further describes a method of mounting a secondary nacelle structure (20S) underneath a wind turbine nacelle (20) using a number of such installation assemblies (1).

Anmelder

Firma
Siemens Gamesa Renewable Energy Innovation & Technology S.L.
Land
🇪🇸 Spanien
🇪🇸 Siemens Gamesa Renewable Energy

Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.

243 Patente in unserer Datenbank

Vertreten von

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen