Verbesserungen im Zusammenhang mit dem Betrieb von Energieableitungsschaltungen in Stromübertragungsnetzwerken
Anmelder: GE Vernova Technology GmbH 🇨🇭
Details
- Veröffentlichungs-Nr.
- EP4742478
- Anmeldetag
- 8. November 2024
- Veröffentlichung
- 13. Mai 2026
- Rechtsraum
- EP
- IPC
- H02J3/00, H02J3/36, H02H7/26
Abstract
There is provided a computer-implemented method (400) of controlling an energy dissipation means for dynamic braking in a power transmission network, the method (400) comprising: monitoring (410) one or more first parameters associated with the power transmission network; determining (420), based on the one or more first parameters, a fault status of the power transmission network; and controlling (430), based on the fault status, the energy dissipation means to perform dynamic braking for the power transmission network; wherein the controlling (430), based on the fault status, the energy dissipation means, comprises adaptively controlling by either of: adjusting (430a) a threshold voltage for activating the energy dissipation means or controlling (430b) the energy dissipation means to perform dynamic braking until the MCB is determined to be in a non-conducting state.
Anmelder
- Firma
- GE Vernova Technology GmbH
- Land
- 🇨🇭 Schweiz
Schweizer Gesellschaft der GE-Vernova-Gruppe mit Sitz in der Schweiz. Das Unternehmen entwickelt Technologien für Energieerzeugung, Stromnetze und erneuerbare Energien, darunter Gasturbinen, Netztechnik und Windkraftlösungen.
705 Patente in unserer Datenbank
Vertreten von
-
Openshaw & Co
Openshaw & Co · Onex