Verfahren und System zur Berechnung der Projektvervollständigungszeit auf der Basis von Graphverarbeitung
Anmelder: Tata Consultancy Services Limited 🇮🇳
Details
- Veröffentlichungs-Nr.
- EP4756689
- Anmeldetag
- 2. Dezember 2025
- Veröffentlichung
- 10. Juni 2026
- Rechtsraum
- EP
- IPC
- G06Q10/10
Abstract
Traditional algorithms for computing/estimating project completion time often fail to provide accurate project duration estimates. Pre-existing methods rely on project size and team size to estimate project duration and overlook the complex interdependencies between tasks and the variability in task execution times. System and method of proposed approach fetches a requirement vector of a target project as input. Further, a plurality of instance precedence graphs of the target project are generated by processing the requirement vector along with a merged probability graph. The merged probability graph represents a transition likelihood between different types of tasks based on a historical project data. Further, a plurality of projects that are similar to the target project are determined. Further, a completion time of the target project represented by the requirement vector is computed based on completion time of the plurality of projects that are similar to the target project.
Anmelder
- Firma
- Tata Consultancy Services Limited
- Land
- 🇮🇳 Indien
Indisches IT-Dienstleistungs- und Beratungsunternehmen, Teil der Tata Group. Bietet Softwareentwicklung, IT-Consulting, Outsourcing und digitale Transformationslösungen für Unternehmenskunden weltweit an.
1.851 Patente in unserer Datenbank
Boehmert & Boehmert geht auf die Zulassung von Dr. Karl Boehmert 1931 in Berlin zurück. Mit Standorten in Deutschland, Alicante, Paris und Shanghai bietet die Kanzlei IP aus einer Hand und legt besonderen Wert auf persönliche Mandantenbetreuung statt Anonymität.