Verfahren zur Steuerung einer Teilkraftsteuerelementanordnung zur Ermöglichung der Turbinenlastverfolgung
Anmelder: Korea Hydro & Nuclear Power Co., Ltd 🇰🇷
Details
- Veröffentlichungs-Nr.
- EP4760748
- Anmeldetag
- 12. August 2024
- Veröffentlichung
- 13. Februar 2025
- Rechtsraum
- EP
Abstract
The present invention relates to a method for controlling a part strength control element assembly to enable turbine load-following, comprising the steps of: identifying operation driving characteristics of a part strength control element assembly according to turbine loads through simulation of power plant-simulation calculations with varying turbine load; determining a maximum insertion position within the core of the part strength control element assembly on the basis of the operation driving characteristics; deriving a target position of the part strength control element assembly according to turbine load on the basis of the maximum insertion position; and controlling the insertion position of the part strength control element assembly according to the target position.
Anmelder
- Firma
- Korea Hydro & Nuclear Power Co., Ltd
- Land
- 🇰🇷 Südkorea
Korea Hydro & Nuclear Power ist der südkoreanische staatliche Betreiber von Kernkraft- und Wasserkraftwerken. Der Großteil des Patentportfolios betrifft elektrische Energietechnik, ergänzt um Mess- und Prüftechnik sowie Softwaretechnik. Anmeldungen laufen durchgehend von 2000 bis in die Gegenwart.
348 Patente in unserer Datenbank
Vertreten von
-
Habermann, Hruschka & Schnabel