Frequenzgangvorhersage auf Basis von Umgebungsmessungen

EP4787649 5. August 2026

Anmelder: Hitachi Energy Ltd 🇨🇭

Details

Veröffentlichungs-Nr.
EP4787649
Anmeldetag
31. Januar 2025
Veröffentlichung
5. August 2026
Rechtsraum
EP
IPC
H02J3/00, H02J13/00
Offizieller Volltext

Abstract

The disclosure provides a method for creating a model for predicting frequency responses in a power grid and/or for inertia estimation in the power grid, the method comprising: acquiring a plurality of node data, wherein each of the plurality of node data represents a frequency time series at a corresponding node of a plurality of nodes of the power grid in an ambient state; grouping the plurality of nodes into clusters, wherein each of the clusters comprises at least one of the plurality of nodes; creating a node data average for each of the clusters based on the node data of the nodes comprised by the corresponding cluster; and creating the model based on the node data averages.

Anmelder

Firma
Hitachi Energy Ltd
Land
🇨🇭 Schweiz
🇨🇭 Hitachi Energy

Unternehmen mit Sitz in der Schweiz, hervorgegangen aus dem japanischen Hitachi-Konzern und der früheren Energiesparte von ABB. Entwickelt Technik für Stromübertragung, -verteilung und Netzautomatisierung.

1.608 Patente in unserer Datenbank

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen