Fehlerdurchlaufverwaltung für Hybridkraftwerke
Anmelder: Siemens Gamesa Renewable Energy A/S 🇩🇰
Details
- Veröffentlichungs-Nr.
- EP4794158
- Anmeldetag
- 25. August 2025
- Veröffentlichung
- 19. August 2026
- Rechtsraum
- EP
- IPC
- H02J3/38, H02J3/46
Abstract
The present invention relates to a method to control a renewable power plant (2) having a rated plant power being a maximal power generation of first power devices (3) and second power devices (4) of the renewable power plant (2), and where the power plant (2) is adapted to feed generated power to an electrical distribution grid (7) having a grid capacity, where the grid capacity is limited relative to the rated plant power, and wherein the control includes a for at least the first power devices (3) to be operated by basic FRT schedules at the detection of an event in the electrical distribution grid (7), and where the method includes to replace the basic FRT schedules with updated FRT schedules under given event conditions (deviation) where updated FRT schedules is updated within a maximum time distance to the detection of the event. The present invention further relates to a controller operating the method, and a renewable power plant being controlled accordingly.
Anmelder
- Firma
- Siemens Gamesa Renewable Energy A/S
- Land
- 🇩🇰 Dänemark
Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.
2.713 Patente in unserer Datenbank
Fachgebiete
Vertreten von
-
SGRE-Association
SGRE-Association · Erlangen