Fehlerdurchlaufverwaltung für Hybridkraftwerke

EP4794158 19. August 2026

Anmelder: Siemens Gamesa Renewable Energy A/S 🇩🇰

Details

Veröffentlichungs-Nr.
EP4794158
Anmeldetag
25. August 2025
Veröffentlichung
19. August 2026
Rechtsraum
EP
IPC
H02J3/38, H02J3/46
Offizieller Volltext

Abstract

The present invention relates to a method to control a renewable power plant (2) having a rated plant power being a maximal power generation of first power devices (3) and second power devices (4) of the renewable power plant (2), and where the power plant (2) is adapted to feed generated power to an electrical distribution grid (7) having a grid capacity, where the grid capacity is limited relative to the rated plant power, and wherein the control includes a for at least the first power devices (3) to be operated by basic FRT schedules at the detection of an event in the electrical distribution grid (7), and where the method includes to replace the basic FRT schedules with updated FRT schedules under given event conditions (deviation) where updated FRT schedules is updated within a maximum time distance to the detection of the event. The present invention further relates to a controller operating the method, and a renewable power plant being controlled accordingly.

Anmelder

Firma
Siemens Gamesa Renewable Energy A/S
Land
🇩🇰 Dänemark
🇪🇸 Siemens Gamesa Renewable Energy

Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.

2.713 Patente in unserer Datenbank

Vertreten von

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen