Aufwecksteuerung in einer Windturbine auf Basis der Korrektur von Windturbinenaufweckzentrumserkennungen
Anmelder: Siemens Gamesa Renewable Energy A/S 🇩🇰
Details
- Veröffentlichungs-Nr.
- EP4796781
- Anmeldetag
- 25. Februar 2025
- Veröffentlichung
- 26. August 2026
- Rechtsraum
- EP
- IPC
- F03D7/02, F03D7/04, F03D17/00
Abstract
The present invention relates to a method to control wake in a wind farm (2) comprising plural of wind turbines (3), where the method includes;- providing a free wind at the wind farm (2), where the free wind includes a free wind direction (10),- using the free wind direction (10) to identify at least one waked wind turbine (3b, 3c) and a waking wind turbine (3a, 3b) waking the waked wind turbine (3b, 3c),- for a period of time measure or register multiple sampling parameters at the waked wind turbine (3b, 3c) covering a range of wind directions (10),- calculate a relation factor (40) based on a relation between the sampling parameters of the waked wind turbine (3b, 3c) and similar sampling parameters of a second wind turbine (3),- use the relation factor (40) to identify a wake position (30, 30new),- control a waking wind turbine (3a, 3b) of the waked wind turbine (3b, 3c) based on a correction related to the identified wake position (30, 30new).The invention further relates to a controller to perform the method, and a wind turbine or wind farm being controlled accordingly.
Anmelder
- Firma
- Siemens Gamesa Renewable Energy A/S
- Land
- 🇩🇰 Dänemark
Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.
2.713 Patente in unserer Datenbank
Fachgebiete
Vertreten von
-
SGRE-Association
SGRE-Association · Erlangen