Anordnung zur Installation Und/oder zum Transport mehrerer Türme und Verfahren zur Abschwächung Windinduzierter Schwingungen an Türmen Während der Installation von Windturbinen

EP4807174 16. September 2026

Anmelder: Siemens Gamesa Renewable Energy A/S 🇩🇰

Details

Veröffentlichungs-Nr.
EP4807174
Anmeldetag
12. März 2025
Veröffentlichung
16. September 2026
Rechtsraum
EP
IPC
F03D13/10, F03D13/40
Offizieller Volltext

Abstract

An arrangement for installation and/or transport of a plurality of towers and a method for mitigating a wind-induced vibrations on towers during the installation of wind turbines. An arrangement for installation and/or transport of a plurality of towers comprising at least one permeable membrane and a plurality of towers is provided. The permeable membrane is securely fixed to at least a pair of towers. Furthermore, a method for mitigating wind-induced vibrations, e.g. aeroelastic phenomena, on towers during installation and/or transport is provided. The method comprising the steps of arranging a plurality of towers side by side, thereby forming a tower group, positioning a permeable membrane to a first tower and a second tower of the group of towers, such that the permeable membrane is fixedly secured to an upper portion of the first and second towers, such that the permeable membrane extends therebetween the first and the second tower.

Anmelder

Firma
Siemens Gamesa Renewable Energy A/S
Land
🇩🇰 Dänemark
🇪🇸 Siemens Gamesa Renewable Energy

Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.

2.723 Patente in unserer Datenbank

Vertreten von

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen