Verfahren zur Montage eines Spannsystems, Führung, Spannsystem und Windenergieanlage

EP4814295 30. September 2026

Anmelder: Nordex Energy Spain, S.A.U. 🇪🇸

Details

Veröffentlichungs-Nr.
EP4814295
Anmeldetag
28. März 2025
Veröffentlichung
30. September 2026
Rechtsraum
EP
IPC
F03D1/06, F03D80/70
Offizieller Volltext

Abstract

A method comprises:- attaching a first guide (351) to a bearing (200),- introducing a first end region (371) of a first tensioner (331) into the first guide (351),- wrapping the first tensioner (331) around the bearing (200),- introducing the first end region (371) into a first retaining device (341),- introducing a second end region (372) of the first tensioner (331) into the first retaining device (341),- tensioning the first tensioner (331) by pulling on the first end (361) and/or second end (362),- fixing each of the first end region (371) and the second end region (372) to the first retaining device (341) under tension. A guide, a tensioning system and a wind turbine are also disclosed

Anmelder

Firma
Nordex Energy Spain, S.A.U.
Land
🇪🇸 Spanien
🇪🇸 Nordex Energy Spain

Spanische Tochtergesellschaft des deutschen Windkraftanlagenherstellers Nordex, die Windenergieanlagen und zugehörige Komponenten entwickelt.

152 Patente in unserer Datenbank

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen