Verfahren zur Montage eines Spannsystems, Führung, Spannsystem und Windenergieanlage
Anmelder: Nordex Energy Spain, S.A.U. 🇪🇸
Details
- Veröffentlichungs-Nr.
- EP4814295
- Anmeldetag
- 28. März 2025
- Veröffentlichung
- 30. September 2026
- Rechtsraum
- EP
- IPC
- F03D1/06, F03D80/70
Abstract
A method comprises:- attaching a first guide (351) to a bearing (200),- introducing a first end region (371) of a first tensioner (331) into the first guide (351),- wrapping the first tensioner (331) around the bearing (200),- introducing the first end region (371) into a first retaining device (341),- introducing a second end region (372) of the first tensioner (331) into the first retaining device (341),- tensioning the first tensioner (331) by pulling on the first end (361) and/or second end (362),- fixing each of the first end region (371) and the second end region (372) to the first retaining device (341) under tension. A guide, a tensioning system and a wind turbine are also disclosed
Anmelder
- Firma
- Nordex Energy Spain, S.A.U.
- Land
- 🇪🇸 Spanien
Spanische Tochtergesellschaft des deutschen Windkraftanlagenherstellers Nordex, die Windenergieanlagen und zugehörige Komponenten entwickelt.
152 Patente in unserer Datenbank