System und Verfahren zur Verarbeitung von Syngas aus einem Brennstoffzellensystemabgas
Anmelder: Bloom Energy Corporation 🇺🇸
Details
- Veröffentlichungs-Nr.
- EP4815073
- Anmeldetag
- 18. März 2026
- Veröffentlichung
- 30. September 2026
- Rechtsraum
- EP
Abstract
A method includes providing fuel and air to a fuel cell system to generate electric power, an anode exhaust and a cathode exhaust, separating at least a portion of water and carbon dioxide from the anode exhaust received from the fuel cell system to form syngas containing at least 50 molar percent of a mixture of hydrogen and carbon monoxide, recycling a first portion of the syngas output from the exhaust processing system to the fuel cell system, and providing a second portion of the syngas output from the exhaust processing system to a syngas system to generate a product using the syngas.
Anmelder
- Firma
- Bloom Energy Corporation
- Land
- 🇺🇸 USA
Wuesthoff & Wuesthoff wurde 1927 in Berlin von Dr. Franz und Dr. Freda Wuesthoff gegründet, die erste deutsche Patentanwältin, und zog 1949 nach München. Schwerpunkte liegen in Biotechnologie und Life Sciences, beraten wird auch auf Chinesisch, Koreanisch und Japanisch.