Verfahren und Verarbeitungssystemverfahren zur Auflösung einer Überlastung in einem Stromnetz

EP4826938 21. Oktober 2026

Anmelder: Hitachi Energy Germany AG 🇩🇪

Details

Veröffentlichungs-Nr.
EP4826938
Anmeldetag
16. April 2025
Veröffentlichung
21. Oktober 2026
Rechtsraum
EP
IPC
H02J3/00, H02J13/00
Offizieller Volltext

Abstract

To perform a congestion resolution for a power grid (10), a processing system (50) is provided. The power grid (10) comprises a plurality of grid nodes (11-22) and a plurality of branches (30). Responsive to detection of a congestion, the processing system (50) is operative to perform a process that comprises determining a linearized correlation of changes in grid node conditions and a magnitude of an electrical quantity for at least one congested branch (31, 32). The processing system (50) is operative to determine the linearized correlation based on a phase angle (83) of the electrical quantity. The processing system (50) is operative to perform or enable at least one control action to resolve the congestion.

Anmelder

Firma
Hitachi Energy Germany AG
Land
🇩🇪 Deutschland
Kanzlei
meier ip München, Deutschland

Kanzlei in München, spezialisiert auf Patent- und Markenrecht mit Schwerpunkt auf computerimplementierten Erfindungen und mathematisch-technischen Fragestellungen, vertritt vor dem Deutschen und dem Europäischen Patentamt.

209
Patente gesamt
1
Patentanwälte
1
Standorte

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen