Verfahren und Verarbeitungssystemverfahren zur Auflösung einer Überlastung in einem Stromnetz

EP4826939 21. Oktober 2026

Anmelder: Hitachi Energy Germany AG 🇩🇪

Details

Veröffentlichungs-Nr.
EP4826939
Anmeldetag
16. April 2025
Veröffentlichung
21. Oktober 2026
Rechtsraum
EP
IPC
H02J3/00, H02J3/50, H02J13/00
Offizieller Volltext

Abstract

To perform a congestion resolution for a power grid (10), a processing system (50) is provided. The power grid (10) comprises a plurality of grid nodes (11-22) and a plurality of branches (30). The plurality of grid nodes (11-22) comprises delta-connected assets. Responsive to detection of a congestion, the processing system (50) is operative to perform a process that comprises determining settings for grid nodes that mitigate the congestion. The processing system (50) is operative such that determining the settings comprises determining transformation matrices for the delta-connected assets that map active and reactive phase-to-phase power deviations for the delta-connected assets to active and reactive phase-to-neutral power deviations with respect to a ground reference.

Anmelder

Firma
Hitachi Energy Germany AG
Land
🇩🇪 Deutschland
Kanzlei
meier ip München, Deutschland

Kanzlei in München, spezialisiert auf Patent- und Markenrecht mit Schwerpunkt auf computerimplementierten Erfindungen und mathematisch-technischen Fragestellungen, vertritt vor dem Deutschen und dem Europäischen Patentamt.

209
Patente gesamt
1
Patentanwälte
1
Standorte

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen