Anordnung und Verfahren für ein Wasserkraftwerk zur Steuerung der Energieerzeugung und des Energieverbrauchs

EP4838082 11. November 2026

Anmelder: Fortum OYJ 🇫🇮

Details

Veröffentlichungs-Nr.
EP4838082
Anmeldetag
30. April 2026
Veröffentlichung
11. November 2026
Rechtsraum
EP
Offizieller Volltext

Abstract

There is provided an arrangement configured to control energy production and consumption of the arrangement, the arrangement comprising: a hydropower plant connected to an electricity network (122), the hydropower plant including at least one turbine generator (121), and at least one electric boiler (111) connected to the electricity network (122). Output power (P<sub>out</sub>) of the arrangement comprises a sum of power (Pt) produced by the at least one turbine generator (121) and power (P<sub>b</sub>) of the at least one electric boiler (111). The output power (P<sub>out</sub>) of the arrangement is controllable such that the at least one turbine generator (121) is configured to produce power (P<sub>t</sub>) and the at least one electric boiler (111) is configured to consume power (P<sub>b</sub>).

Anmelder

Firma
Fortum OYJ
Land
🇫🇮 Finnland

Vertreten von

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen