Verfahren zum Betreiben eines Windparks

EP4838089 11. November 2026

Anmelder: Siemens Gamesa Renewable Energy A/S 🇩🇰

Details

Veröffentlichungs-Nr.
EP4838089
Anmeldetag
8. Mai 2025
Veröffentlichung
11. November 2026
Rechtsraum
EP
IPC
F03D7/04, F03D17/00
Offizieller Volltext

Abstract

The invention describes a method of operating a wind park (2WP) comprising steps of identifying a wind turbine pair (2A, 2B) comprising a first wind turbine (2A) and a second wind turbine (2B); determining a spatial relationship (α) between the second wind turbine (2B) and the first wind turbine (2A); obtaining a first wind direction reading (2A<wd>) indicative of the wind direction (D<true>) at the first wind turbine (2A); determining a pair-adjusted wind direction (2A2B<wd>) for the second wind turbine (2B) on the basis of the first wind direction reading (2A<wd>) and the spatial relationship (α); and deducing the existence of a wake-induced wind direction error at the second wind turbine (2B) on the basis of the pair-adjusted wind direction (2A2B<wd>). The invention further describes a control arrangement (1) for carrying out the claimed method, and a wind park (2WP) operated using the claimed method.

Anmelder

Firma
Siemens Gamesa Renewable Energy A/S
Land
🇩🇰 Dänemark
🇪🇸 Siemens Gamesa Renewable Energy

Spanisches Unternehmen im Bereich erneuerbare Energien, entwickelt und fertigt Windkraftanlagen sowie zugehörige Technologien für Onshore- und Offshore-Windparks.

2.754 Patente in unserer Datenbank

Vertreten von

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen