Verfahren zum Betrieb eines Zonenreglers
Anmelder: Interroll Holding AG 🇨🇭
Details
- Veröffentlichungs-Nr.
- EP4838394
- Anmeldetag
- 4. Mai 2026
- Veröffentlichung
- 11. November 2026
- Rechtsraum
- EP
Abstract
Method of setting a zone controller (12), adapted to control the operation of a conveyor zone (2) within a conveyor arrangement (1), into operation;the zone controller (12) is adapted- to control the operation of a conveyor zone (2) within a conveyor arrangement (1);- to communicate with other zone controller (12) in the same conveyor arrangement;the method comprises to the following steps:- starting the zone controller (12);- loading at least one boot code (BC1, BC2) and executing the boot code (BC1, BC2);- loading a firmware (FW) and executing the firmware (FW);- before loading the firmware for execution, checking the firmware (FM) for authentication (AC) by a safety functionality (SF).
Anmelder
- Firma
- Interroll Holding AG
- Land
- 🇨🇭 Schweiz