Verfahren zur Montage eines Windenergieanlagen-Antriebsstranges sowie Windenergieanlagen-Antriebsstrang
Anmelder: Siemens Gamesa Renewable Energy Eolica S.L. 🇪🇸
Details
- Veröffentlichungs-Nr.
- EP4841102
- Anmeldetag
- 16. Mai 2025
- Veröffentlichung
- 18. November 2026
- Rechtsraum
- EP
Abstract
The invention describes a method for installing a wind turbine drive train (7) for transmitting torque from a wind rotor (4) to a generator (9), said wind turbine drive train (7) comprising a support frame (16), a bearing unit (20), first fixing means (30) and second fixing means (32). The method comprising the steps of connecting the bearing unit (20) to the support frame (16) with the first fixing means (30) to the support frame (16), adjusting the position of the bearing unit (20) relative to the support frame (16), and fixing the bearing unit (20) rigidly to the support frame (16) with the second fixing means.
Anmelder
- Firma
- Siemens Gamesa Renewable Energy Eolica S.L.
- Land
- 🇪🇸 Spanien
Vertreten von
-
SGRE-Association
SGRE-Association · Erlangen