Energieerzeugungsanlagensteuerung als Reaktion auf ein Netzereignis

EP4841849 18. November 2026

Anmelder: GE Vernova Infrastructure Technology LLC 🇺🇸

Details

Veröffentlichungs-Nr.
EP4841849
Anmeldetag
5. März 2026
Veröffentlichung
18. November 2026
Rechtsraum
EP
Offizieller Volltext

Abstract

A method for controlling a power generating asset includes calculating minimum and maximum recovery times at an end of a voltage-drop grid event as a function of a pre-voltage-drop power and a post-voltage-drop power. The method also includes defining a maximum recovery rate of power recovery based on grid strength and determining a first rate of the power recovery such that the pre-voltage-drop power is reached at the minimum recovery time. Further, the method includes increasing the post-voltage-drop power by the first rate until a first recovery time in which condition(s) indicate further power increase is unfavorable and maintaining the power recovery at a minimum defined recovery rate from the first recovery time to a second recovery time. Moreover, the method includes determining a second rate of the power recovery to be a minimum value between the maximum recovery rate and a rate of the power recovery required to reach the pre-voltage-drop power at the minimum recovery time. In addition, the method includes increasing the power recovery by the second rate and applying the maximum recovery rate until the pre-voltage-drop power is reached before the maximum recovery time if, at any time between the first recovery time and the second recovery time, the maximum recovery rate needs to be applied in order to meet the maximum recovery time.

Anmelder

Firma
GE Vernova Infrastructure Technology LLC
Land
🇺🇸 USA