Hierarchische Verteilte Steuerung von Verteilten Energieressourcen (ders)

EP4722027 8. April 2026

Anmelder: Itron, Inc. 🇺🇸

Details

Veröffentlichungs-Nr.
EP4722027
Anmeldetag
2. Oktober 2025
Veröffentlichung
8. April 2026
Rechtsraum
EP
IPC
(GEN ELECTRIC et al.)
Offizieller Volltext

Abstract

Techniques for allocating a load capacity to on-site smart sensors coupled to distributed energy resources (DERs) are described herein. For example, a primary smart sensor may receive, from a utility supplier (e.g., which may include a substation), a maximum load constraint associated with a network of smart utility sensors in an autonomous routing area. The maximum load constraint may be a maximum load and/or maximum capacity that the network of smart utility sensors may collectively operate with by a transformer carrying the load. In some examples, the primary smart sensor may receive utility data from the smart sensors and may determine a total transformer load associated with the transformer that is providing power to the network of smart utility sensors based at least in part on the utility data.

Anmelder

Firma
Itron, Inc.
Land
🇺🇸 USA
Kanzlei
Kilburn & Strode LLP

Kilburn & Strode wurde 1906 in London gegründet und war die erste europäische Patent- und Markenkanzlei, deren Anwälte in Kalifornien als Foreign Legal Consultants zugelassen wurden. Präsenzen bestehen zudem in den Niederlanden, München sowie San Francisco und Boston.

22.492
Patente gesamt
35
Patentanwälte
2
Standorte

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen