Verfahren zur Verwaltung eines Automatisierungssystems und Vorrichtung zur Implementierung davon
Anmelder: SCHNEIDER ELECTRIC INDUSTRIES SAS 🇫🇷
Details
- Veröffentlichungs-Nr.
- EP4760426
- Anmeldetag
- 13. Dezember 2024
- Veröffentlichung
- 17. Juni 2026
- Rechtsraum
- EP
- IPC
- G05B19/418
Abstract
A method for managing a first node of a control network of an industrial automation system, the method being implemented by the first node, is provided, which comprises: obtaining configuration information that comprises node pairing information related to pairing with one or more other nodes of the control network by performing a redundancy pairing procedure with the first node for synchronizing a first set of one or more states of the first node between the first node and the one or more other nodes of the control network, wherein the node pairing information comprises pair node information that identifies a second node of the control network, and spare node identification information that identifies a spare node of the control network, determining that the second node cannot be paired with the first node, and upon determining that the second node cannot be paired with the first node, performing the redundancy pairing procedure for pairing with the spare node for synchronizing a second set of one or more states of the first node between the first node and the spare node.
Anmelder
- Firma
- SCHNEIDER ELECTRIC INDUSTRIES SAS
- Land
- 🇫🇷 Frankreich
Französisches Unternehmen, das Lösungen für Energiemanagement, Automatisierung sowie elektrische Ausrüstung für Gebäude, Industrie und Infrastruktur entwickelt.
476 Patente in unserer Datenbank
Vertreten von
-
Plasseraud IP