Batterie und Betriebsverfahren dafür

EP4768950 3. Juli 2025

Anmelder: LG Energy Solution, Ltd. 🇰🇷

Details

Veröffentlichungs-Nr.
EP4768950
Anmeldetag
14. August 2024
Veröffentlichung
3. Juli 2025
Rechtsraum
EP
Offizieller Volltext

Abstract

A battery according to one embodiment disclosed herein may include a first measurement unit configured to measure a first voltage, which is a voltage between a first busbar connecting a first battery cell to a second battery cell and a second busbar connecting a third battery cell to a fourth battery cell, and transmit the first voltage to a management unit, a second measurement unit configured to measure a second voltage, which is a voltage between a third busbar connecting the second battery cell to the third battery cell and a fourth busbar connecting the fourth battery cell to a fifth battery cell, and transmit the second voltage to the management unit, and the management unit configured to calculate a voltage of the third battery cell by mathematically calculating the first voltage and the second voltage.

Anmelder

Firma
LG Energy Solution, Ltd.
Land
🇰🇷 Südkorea
🇰🇷 LG Energy Solution

Südkoreanisches Unternehmen der LG-Gruppe, das Lithium-Ionen-Batterien und Batteriesysteme entwickelt und herstellt, insbesondere für Elektrofahrzeuge, Energiespeicher sowie mobile und portable Elektronikgeräte.

10.593 Patente in unserer Datenbank

Vertreten von

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen