Leistungsverwaltungsvorrichtung und Leistungsverwaltungssystem

EP4783395 29. Juli 2026

Anmelder: Prime Planet Energy & Solutions, Inc. 🇯🇵

Details

Veröffentlichungs-Nr.
EP4783395
Anmeldetag
29. Dezember 2025
Veröffentlichung
29. Juli 2026
Rechtsraum
EP
IPC
H02J3/00
Offizieller Volltext

Abstract

In power management device, a power consumption predictor creates a predicted consumption time zone in which a predicted power consumption amount of a load for every future elapsed time is predicted. A first calculator calculates a system conversion efficiency of a system power supply for every future elapsed time, and a second calculator calculates a specific conversion efficiency of a specific power supply for the every future elapsed time. A specifier specifies, as a specific time zone, a time zone in which the specific conversion efficiency is greater than or equal to the system conversion efficiency in the predicted consumption time zone. A planner makes a supply plan such that electric power is supplied from the specific power supply to the load for every future elapsed time in the specific time zone.

Anmelder

Firma
Prime Planet Energy & Solutions, Inc.
Land
🇯🇵 Japan
🇯🇵 Prime Planet Energy & Solutions

Japanisches Gemeinschaftsunternehmen von Toyota und Panasonic mit Sitz in Tokio, spezialisiert auf Entwicklung und Herstellung von Batteriezellen und Batteriesystemen für Fahrzeuge.

507 Patente in unserer Datenbank

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen