Leistungsverwaltungssystem und Leistungsverwaltungsverfahren
Anmelder: Toyota Jidosha Kabushiki Kaisha 🇯🇵
Details
- Veröffentlichungs-Nr.
- EP4819426
- Anmeldetag
- 18. März 2026
- Veröffentlichung
- 7. Oktober 2026
- Rechtsraum
- EP
Abstract
A power management system (100) includes a control target device (30) connected to an electric power network, a server (10) that generates a control plan for the control target device (30) and generates a control command that is based on the control plan, and a controller (20) that controls the control target device (30). The controller (20) includes a memory (21) that stores the control plan and a circuitry. The circuitry detects a state in which a control command is unable to be received from the server (10) as a communication abnormality state. When the communication abnormality state has not been detected, the circuitry relays the control command received from the server (10) to the control target device (30) to control the control target device (30). When the communication abnormality state has been detected, the circuitry generates a control command based on the control plan stored in the memory (21) to control the control target device (30) using the generated control command.
Anmelder
- Firma
- Toyota Jidosha Kabushiki Kaisha
- Land
- 🇯🇵 Japan
Japanischer Automobilhersteller mit Sitz in Toyota City, gegründet 1937. Entwickelt und produziert Pkw, Nutzfahrzeuge, Hybrid- und Wasserstoffantriebe sowie zugehörige Fahrzeugtechnologien.
22.806 Patente in unserer Datenbank