Verfahren zur Optimierten Leistungsverteilung von einer Ladestation zum Aufladen von Elektro- oder Elektrifizierten Fahrzeugen unter einer Vielzahl von Ladegeräten zum Aufladen von Fahrzeugen und Zugehörige Ladestation

EP4748631 27. Mai 2026

Anmelder: Bitron Electronics S.p.A. Con Unico Socio 🇮🇹

Details

Veröffentlichungs-Nr.
EP4748631
Anmeldetag
17. November 2025
Veröffentlichung
27. Mai 2026
Rechtsraum
EP
Offizieller Volltext

Abstract

Method for optimized power distribution from a charging station (3) for recharging vehicles (V), among charging devices (5), comprising a control unit (30) adapted to execute the method. The method comprises the steps of: receiving a plurality of intrinsic data (D) of the charging station (3) at a time instant (T), wherein the data (D) comprise: a maximum available current (Aa); a total used current (Au); a priority order of the vehicles (V); determining a current surplus (As); checking if a vehicle (V) has arrived; if NO, returning to the step of receiving a plurality of data (D); if YES, executing one or more of the following steps of checking if: at least a period of time (Δt1, Δt2) has already elapsed since the arrival of a previous vehicle (V); one or more vehicles (V) have arrived; one or more vehicles (V) have left the charging station (3); said maximum available current (Aa) has increased. If the answer obtained from all checks made after the arrival of a vehicle (V) is NO, or in parallel with said steps of checking: checking if the maximum available current (Aa) has decreased. If the answer obtained from at least one of the checks made after the arrival of a vehicle (V) is YES and the maximum available current has not decreased: distributing the current surplus (As) among the vehicles by increasing the current supplied to the vehicles (V), taking into account the priority order. If the maximum available current has decreased, decreasing the current supplied for recharging the vehicles (V), taking into account the priority order.

Anmelder

Firma
Bitron Electronics S.p.A. Con Unico Socio
Land
🇮🇹 Italien
Kanzlei
Barzanò & Zanardo S.p.A. Milano, Italien

Barzanò & Zanardo geht auf 1878 in Mailand und 1880 in Rom gegründete Büros zurück, die sich 1906 zusammenschlossen. Das Haus expandierte über Turin, Biella, Vicenza, Rimini und Pordenone, 2024 zu einem Unternehmen verschmolzen, mit dem Nachhaltigkeitsprogramm „B&Z Greens The Planet“.

3.710
Patente gesamt
14
Patentanwälte
3
Standorte

Noch Fragen?

Wir helfen Ihnen gerne weiter. Schreiben Sie uns einfach.

Kontakt aufnehmen